Logo Jober.uk
Navartis
Navartis

Navartis

added: 3 months ago133Views

Services Manager - Data Centre Construction

Location

SydneyAustraliaAustralia

salary

101200-123600 AUD / annum

Required language
-
Job Type
Part-time contract
Experience
-

About the Role

We're working with a major main contractor delivering a large-scale hyperscale data centre campus, and are seeking an experienced Services Manager to lead the coordination, integration, and commissioning of all MEP and critical systems through to handover.

This is a senior technical leadership role suited to someone who has grown through electrical, mechanical, commissioning, or MEP coordination disciplines and is ready to own the full services scope on a major mission-critical build.

Scope & Responsibilities

  • Coordinate all services trades - electrical, HVAC, fire protection, controls, communications, and commissioning teams, ensuring systems integrate correctly both physically and operationally
  • Manage critical power infrastructure: switchboards, transformers, generators, UPS systems, battery rooms, busways, and redundant power feeds
  • Oversee cooling and thermal management, including chillers, cooling towers, containment systems, pipework, and airflow balancing
  • Lead BIM-driven coordination: clash detection, coordinated services drawings, and sequencing reviews
  • Own testing and commissioning delivery, including integrated systems testing, generator load testing, UPS failover testing, black building tests, and thermal testing
  • Act as the technical authority ensuring all critical systems are designed, installed, integrated, and tested to operate continuously without failure

Candidate Profile

  • Background in electrical engineering, mechanical engineering, commissioning engineering, project engineering, or MEP coordination
  • Proven experience delivering MEP/critical systems on large-scale, mission-critical, or hyperscale data centre projects
  • Strong working knowledge of BIM coordination and commissioning methodologies (ATP/IST)
  • Comfortable managing multiple trade contractors and vendors on a fast-paced, high-complexity build
  • Campus-scale or multi-building project experience preferred

Location

Open to candidates based in or willing to relocate from the UK, Ireland, Canada, New Zealand, or Singapore. Visa/relocation support available