

Navartis
added: 3 months ago128Views
BIM Coordinator - Data Centre Construction
Location
WatfordUnited Kingdom
salary
70000-100000 GBP / annum
- Required language
- -
- Job Type
- Part-time contract
- Experience
- -
BIM Coordinator - Data Centre Projects, Europe
On behalf of our client, a mechanical building services contractor expanding its footprint on data centre developments across Europe, we are recruiting a BIM Coordinator to join the project delivery team on a 27MW hyperscale data centre, located approximately 25 minutes from Frankfurt airport.
Key Responsibilities
- Build and maintain models and reporting outputs in line with company standards.
- Produce general arrangement drawings and detailing sheets.
- Support and help drive the transition from 2D working to full 3D delivery.
- Maintain drawing control processes and keep drawing registers and schedules current.
- Support the rollout of 3D tools with BIM technicians, 4D with project teams, 5D with the estimating function, 6D with operations, and 7D with the FM team.
- Assist with establishing off-site drawing and model storage/control processes.
- Contribute to the ongoing development of BIM protocols and systems, including showcasing BIM capability to external clients and consultants where required.
- Champion the value of BIM internally and support training and mentoring of staff completing training modules.
- Support continuous improvement of the integrated management system, keeping abreast of emerging technology.
- Prepare material procurement schedules and requisition timelines for projects.
- Liaise with subcontractors, client consultants and the main contractor to ensure correct on-site installation.
Requirements
- Third-level qualification or relevant trade background advantageous.
- Minimum 2 years' experience in a similar position.
- Able to build 3D construction models from source data, P&IDs, facility scans and point-cloud data.
- Able to produce construction-level detailing to support automated isometric and BOM generation.
- Experience with clash detection and management across building services systems.
- Strong problem-solving ability to resolve coordination and design issues.
- Comfortable carrying out field surveys and verification.
- Experience developing 3D coordination models and structural layouts for clash avoidance.
- Able to produce builders' work schedules and associated drawings.
- Skilled in producing 2D/3D design drawings, prefabrication isometrics and detail drawings.